INPUT DATA
|
Number of MPP trackers
|
1
|
Max. PV input power
|
8.0 kW
|
Max. input current (Idc max)
|
1 x 16 A
|
Max. short circuit current, module array
|
24 A
|
IDC input voltage range (Udc min - Udc max)
|
150 - 1000 V
|
Feed-in start voltage (Udc start)
|
200 V
|
Usable MPP voltage range
|
150 - 800 V
|
Number of DC connections (PV)
|
2
|
BATTERY INPUT
|
Maximum output power to battery
|
Depends on connected Battery
|
Maximum input power from battery
|
Depends on connected Battery
|
OU TPUT DATA
|
AC nominal output (Pac,r)
|
5,000 W
|
Max. output power
|
5,000 VA
|
Max. power from grid to battery
|
5,000 VA
|
Max. AC output current (Iac max)
|
8.3 A
|
Grid connection (voltage range)
|
3~NPE 400 V / 230 V or 3~NPE 380 V / 220 V (+20 % / -30 %)
|
Frequency (frequency range)
|
50 Hz / 60 Hz (45 - 65 Hz)
|
Total harmonic distortion
|
< 3 %
|
Power factor (cos φac,r)
|
0.85 - 1 ind. / cap.
|
GENERAL DATA
|
Dimensions (height x width x depth)
|
645 x 431 x 204 mm
|
Weight
|
19.9 kg
|
Degree of protection
|
IP 65
|
Protection class
|
1
|
Overvoltage category (DC / AC) 1)
|
2 / 3
|
Inverter design
|
Transformerless
|
Cooling
|
Regulated air cooling
|
Installation
|
Indoor and outdoor installation
|
Ambient temperature range
|
-25 - +60°C
|
Permitted humidity
|
0 - 100 %
|
Max. altitude
|
2,000 m (unrestricted voltage range)
|
DC PV connection technology
|
2x DC+ and 2x DC- screw terminals 2.5 - 16 mm²
|
DC battery connection technology
|
1x DC+ and 1x DC- screw terminals 2.5 - 16 mm²
|
AC connection technology
|
5-pin AC screw terminals 2.5 - 16 mm²
|
Certificates and compliance with standards
|
VDE AR N 4105, ÖVE / ÖNORM E 8001-4-712, DIN V VDE 0126-1-1
|
Emergency power function
|
Yes 2)
|
EFFICIENCY
|
Max. efficiency (PV - grid)
|
97.9 %
|
Max. efficiency (PV - battery - grid)
|
> 90.0 %
|
Europ. efficiency (PV - grid)
|
96.0 %
|
MPP adaptation efficiency
|
> 99.9 %
|
Compati ble Batteries 3)
|
BY D
|
Yes, 3-phase
|
LG CHEM 4)
|
No
|
1) Testing to IEC 62109-1
2) Not available with LG Chem RESU
3) The inverter should always have the latest software update on Solar.web to ensure that the inverter and battery storage are functioning properly.
4) Fronius Checkbox 500V is mandatory
Further information regarding the availability of the inverters in your country can be found at www.fronius.com.
|